Xactimate questions / Getting started

How should an Xactimate Mobile project be set up before an inspection?

Use a pre-inspection Xactimate Mobile setup checklist to prevent wrong-project, price-list, and synchronization problems.

01

The practical answer

Before the inspection, confirm that the correct project is available, required project information is present, the appropriate price list and profile are selected according to company procedure, and the mobile device can open and synchronize the file. Preparation should happen before the operator is standing at the front door.

02

Why this matters in a real field file

Many field problems begin before the first measurement. An incorrect project, missing assignment, outdated reference information, unavailable sketch, or failed synchronization can force the user to rebuild work or rely on incomplete notes.

  • Verify the insured or customer and property address
  • Confirm project status and assignment access
  • Check the applicable profile and price list
  • Download any available roof or property data
  • Open the project and confirm synchronization before travel
03

How Parrot Key teaches it

Parrot Key training begins with a controlled preflight routine. Every student opens the correct file and proves the device is ready before the inspection drill starts.

FAQ

Frequently asked questions

  • Should the roof sketch be reviewed before arriving?

    When an authorized roof sketch or measurement report is part of the workflow, reviewing it beforehand can reveal wrong structures, missing facets, or access questions that should be resolved before estimating.

SRC

Sources and official references

These links point to product owners or other primary sources. Parrot Key uses them as references and writes its training guidance independently.

We will get back to you

Tell us what you need

Send a few details about your role, your team, and what you want to improve. Our team will review it and get back to you.